With $528 million in facility-specific investment and 654 permanent operating jobs announced, this project clears both of AFT's qualifying thresholds ($100 million in facility-specific investment OR 100 permanent operating jobs). This project also meets AFT's primary-source verification and physical U.S. manufacturing-footprint requirements.
View full methodology →The electrical equipment & grid context.
Electrical Equipment & Grid tracks major U.S. factories producing the equipment required to generate, transmit, control, and distribute electricity — including transformers, switchgear, generators, turbines, cables, and other grid components. It distinguishes equipment manufacturing from power generation, utility construction, energy production, and service-only projects.
At a glance
- Company
- Hitachi Energy
- Industry
- Electrical Equipment & Grid
- Location
- Gallman, Mississippi
- Investment
- $528.0M
- Permanent jobs announced
- 654
- Status
- Announced
- Announced
- Sep 15, 2026
- Expected opening
- 2029
- Added to tracker
- Sep 25, 2026
Official references
- Hitachi Energy $528 million Mississippi transformer factory announcement (Sept 15, 2026) https://www.hitachi.com/en-us/press/Hitachi-deepens-commitment-to-us-manufacturing-with-528-million-mississippi-transformer-factory/
- Mississippi Development Authority: Hitachi Energy bringing its largest transformer manufacturing investment in U.S. to Mississippi https://mississippi.org/news/hitachi-energy-bringing-its-largest-transformer-manufacturing-investment-in-u-s-to-mississippi/