With more than $65 billion in facility-specific investment and approximately 6,000 permanent operating jobs announced, this project clears both of AFT's qualifying thresholds ($100 million in facility-specific investment OR 100 permanent operating jobs). It is also confirmed by official public sources and involves a physical manufacturing facility in the United States.
View full methodology →The semiconductors context.
Semiconductor fabrication plants, known as fabs, rank among the most capital-intensive industrial facilities ever built—often requiring $10–$30 billion and several years from groundbreaking to initial production. The CHIPS and Science Act of 2022 accelerated a U.S. construction cycle spanning advanced chip fabrication, legacy-node production, semiconductor equipment, packaging, and critical materials. These projects create long-term manufacturing footprints while attracting suppliers, infrastructure investment, and specialized technical work.
At a glance
- Company
- TSMC
- Industry
- Semiconductors
- Location
- Phoenix, Arizona
- Investment
- More than $65.00B
- Permanent jobs announced
- Approximately 6,000
- Status
- Operational
- Announced
- Apr 8, 2024
- Opening timeline
- Partial startup: TSMC's first Arizona fab began high-volume production in Q4 2024. The second fab's structure was completed in 2025, with volume production targeted for the second half of 2027. The third fab broke ground in April 2025 and targets volume production by the end of the decade.
- Added to tracker
- Apr 15, 2025
Official references
- TSMC Arizona three-fab and direct-jobs announcement https://pr.tsmc.com/english/news/3122
- U.S. Commerce TSMC CHIPS preliminary terms https://www.commerce.gov/news/press-releases/2024/04/biden-harris-administration-announces-preliminary-terms-tsmc-expanded
- TSMC Arizona, "About TSMC Arizona," accessed October 21, 2026 https://www.tsmc.com/static/abouttsmcaz/index.htm
Cite this project
American Factory Tracker. "Arizona Three-Fab Campus — Original Phase — TSMC, Phoenix, AZ." https://americanfactorytracker.com/projects/tsmc-phoenix. Accessed November 19, 2026.
Please also cite the original sources listed above for underlying figures.