With $200 million in facility-specific investment and 448 permanent operating jobs announced, this project clears both of AFT's qualifying thresholds ($100 million in facility-specific investment OR 100 permanent operating jobs). This project also meets AFT's primary-source verification and physical U.S. manufacturing-footprint requirements.
View full methodology →The electrical equipment & grid context.
Electrical Equipment & Grid tracks major U.S. factories producing the equipment required to generate, transmit, control, and distribute electricity — including transformers, switchgear, generators, turbines, cables, and other grid components. It distinguishes equipment manufacturing from power generation, utility construction, energy production, and service-only projects.
At a glance
- Company
- Industrial Electric Mfg. (IEM)
- Industry
- Electrical Equipment & Grid
- Location
- San Antonio, Texas
- Investment
- $200.0M
- Permanent jobs announced
- 448
- Status
- Announced
- Announced
- Aug 25, 2026
- Expected opening
- 2028
- Added to tracker
- Oct 6, 2026
Official references
- Office of the Texas Governor: Governor Abbott announces IEM expansion in Bexar County https://gov.texas.gov/news/post/governor-abbott-announces-iem-expansion-in-bexar-county
- San Antonio Report: Silicon Valley manufacturer IEM to build $200M factory at Brooks in San Antonio https://sanantonioreport.org/silicon-valley-manufacturer-iem-200m-factory-brooks-san-antonio/
Other projects to know
- Electrical Equipment & GridThe Okonite CompanyOrangeburg, South Carolina$400.0M105 jobs
- Electrical Equipment & GridSchweitzer Engineering Laboratories (SEL)Post Falls, Idaho$150.0M250 jobs
- Electrical Equipment & GridHitachi EnergyGallman, Mississippi$528.0M654 jobs