With at least 160 permanent operating jobs announced, this project clears AFT's 100-permanent-job threshold (AFT includes any project meeting $100 million in facility-specific investment OR 100 permanent operating jobs). It is also confirmed by official public sources and involves a physical manufacturing facility in the United States.
View full methodology →The energy equipment context.
Facilities manufacturing power-generation equipment or nuclear fuel, including solar wafers, cells, modules and trackers; wind turbines and components; power-generation turbines and generators; and nuclear fuel and reactor components. Batteries belong in Battery Manufacturing. Transformers, switchgear, cable and grid-protection equipment remain in Electrical Equipment & Grid. Petroleum and synthetic fuels remain in Oil Refining & Fuels.
At a glance
- Company
- GE Vernova
- Industry
- Energy Equipment
- Location
- Schenectady, New York
- Investment
- $50.0M
- Permanent jobs announced
- At least 160
- Status
- Operational
- Announced
- May 23, 2023
- Operations began
- 2023
- Added to tracker
- Apr 15, 2025
Official references
- New York Governor announcement of GE Vernova's Schenectady wind-nacelle investment https://www.governor.ny.gov/news/governor-hochul-announces-ge-vernova-invest-50-million-locate-onshore-wind-nacelle
- GE Vernova operational production confirmation https://www.ge.com/news/press-releases/ge-vernova-produces-first-onshore-wind-turbine-at-new-york-facility
Cite this project
American Factory Tracker. "Schenectady Wind Nacelle Manufacturing — GE Vernova, Schenectady, NY." https://americanfactorytracker.com/projects/ge-vernova-schenectady. Accessed November 28, 2026.
Please also cite the original sources listed above for underlying figures.