With 140 permanent operating jobs announced, this project clears AFT's 100-permanent-job threshold (AFT includes any project meeting $100 million in facility-specific investment OR 100 permanent operating jobs). This project also meets AFT's primary-source verification and physical U.S. manufacturing-footprint requirements.
View full methodology →The factory-built housing context.
Factory-Built Housing tracks qualifying U.S. factories and expansions producing manufactured, modular, volumetric, panelized, prefabricated or 3D-produced housing systems. AFT does not attempt to catalog every longstanding manufactured-home plant.
At a glance
- Company
- FullStack Modular
- Industry
- Factory-Built Housing
- Location
- Carson, California
- Investment
- Not publicly disclosed
- Permanent jobs announced
- 140
- Status
- Operational
- Announced
- Dec 17, 2024
- Operations began
- Dec 17, 2024
- Added to tracker
- Aug 19, 2026
Official references
- Factory opening announcement https://www.prnewswire.com/news-releases/fullstack-modular-opens-west-coast-factory-ushering-in-a-new-era-of-construction-in-california-302331358.html
Other projects to know
- Robotics & Automation1X TechnologiesHayward, CaliforniaNot publicly disclosed200 jobs
- Advanced ManufacturingAtomic MachinesSanta Clara, California$156.0M305 jobs
- SemiconductorsApplied Materials (EPIC Center)Sunnyvale, California$4.00B2,000 jobs
- PharmaceuticalsRoche Group (Genentech)Oceanside, California$450.0M150 jobs