SemiconductorsColorado Springs, ColoradoAnnounced Jun 25, 2024

Entegris (Colorado Springs)

Domestic production of FOUPs and fluid-handling materials for chip manufacturing — CHIPS Act $75M.

Investment
$600.0M
Permanent jobs announced
600
Status
Under Construction
Expected opening
Dec 1, 2026
Why it matters

The semiconductors context.

Semiconductor fabrication plants, known as fabs, rank among the most capital-intensive industrial facilities ever built—often requiring $10–$30 billion and several years from groundbreaking to initial production. The CHIPS and Science Act of 2022 accelerated a U.S. construction cycle spanning advanced chip fabrication, legacy-node production, semiconductor equipment, packaging, and critical materials. These projects create long-term manufacturing footprints while attracting suppliers, infrastructure investment, and specialized technical work.

Project record

At a glance

Company
Entegris (Colorado Springs)
Industry
Semiconductors
Location
Colorado Springs, Colorado
Investment
$600.0M
Permanent jobs announced
600
Status
Under Construction
Announced
Jun 25, 2024
Expected opening
Dec 1, 2026
Added to tracker
Feb 22, 2026
Sources

Official references

  • Primary source
    https://www.entegris.com/en/home/about-us/news/entegris-biden-adminitration-announce-proposed-direct-funding-chips-act.html
Related

Other projects to know

Back to the tracker/projects/entegris-colorado-springs-colorado-springs